Skip to main content
GSAM

GSAM

Change Number: Change 199 GSAR Case 2024-G502
Effective Date: 05/26/2025

514.407-4 Mistakes after award.

514.407-4 Mistakes after award.

The contracting director and assigned counsel are required to review and approve the contracting officer’s determinations under FAR 14.407-4(b) and (c).